Kustian, G., & Asyari, H. (2024). Workload Analysis on Production Planning Control Division Pressure Part Using Full Time Equivalent Method and NASA TLX at PT ABC. Proceeding ICMA-SURE, , 271-278. doi:10.20884/2.procicma.2024.3.1.10145